Health Projects
From state of the art hospitals to full service aged care facilities, we continue to lead the way in the execution of innovative flooring solutions for this sector.
PRINCE OF WALES HOSPITAL NCCC & AATC
Date Delivered: 2016
Builder: A W Edwards
Architect: HDR Rice Daubney
Project Awards:
Excellence in Construction, Winner (2017); Health Category Master Builders Association
European Healthcare Design Awards, Highly Commended (2017); Healthcare Design (Under 25,000 sqm)
This project undertook the design and construction of a purpose-built Health and Research Centre, accommodating cancer and blood disorder research, clinicians and patients, in a distinctive and novel setting.
It required demolition of the existing Oncology building, allowing for construction of the ten-storey concrete framed building and refurbishment of existing sections of Randwick Hospital.
The project consolidated previously dispersed health services to provide specialist treatment areas, consultation rooms, clinics and clean areas now publicly accessible, welcoming in a new era of cancer health treatment and research.
Wollongong Public Hospital – IESS
Date Delivered: July 2015
Builder: Hansen Yuncken
Architect: MBMO
Project Awards:
European Healthcare Design Awards, Highly Commended (2017); Healthcare Design (Under 25,000 sqm)
The redeveloped and expanded Wollongong Hospital set new benchmarks when it opened its doors in December 2015. With a purpose-built Elective Surgical Service Centre containing state-of the-art hybrid operating theatres, Illawarra and South Coast residents can now access specialist treatment of complex cases locally.
The new six-storey Centre, constructed by Hansen Yuncken, accommodates 7 new operating theatres, 14 stage 1 recovery beds, 72 new surgical beds, six additional intensive care/high dependency unit beds, 10 new emergency department beds, a new ambulatory care facility including 22 clinical spaces, and a new sterilising department.
A highlight of the project was the development of highly successful aboriginal participation programs and participation in the national Mates in Construction suicide prevention program.
WOLLONGONG PRIVATE HOSPITAL
RAMSAY HEALTH
Builder: HPI
Architect: Martin Ollman
Hornsby Ku-Ring-Gai Hospital Stage 2 & Medical Imaging Project
Date Delivered: In Progress
Builder: Watpac
Architect: Silver Thomas Hanley
Stage 2 of the project includes a refurbished and expanded Emergency Department and a new multi-storey Clinical Services Building with a multi array of purposes.
Arrow Flooring assisted directly with the supply and installation of floor preparation, carpet, resilient wall and resilient floor finishes. A new Clinical Services Building Including:
• New Mortuary and Pharmacy
• Main Entry with Retail and Front of House (FOH) area, with Medical Assessment Unit and Ambulatory Care Centre
• Intensive Care Unit and combined Coronary Care Unit, Cardiorespiratory Inpatient Unit and Cardiac Investigations Unit.
• Rehabilitation Inpatient Units (Cold Shell)
• Medical Inpatient Unit (including Dementia / Delirium and Stroke Beds)
• Combined Administration, overnight accommodation and Education space with the University of Sydney.